Skip to content

Roadmap

Last updated: 2026-05-29

This is a living document tracking Marianne's path from engineering prototype to shipped product. It reflects the full strategic roadmap generated by the PM replacement score (internal planning material, kept outside this repository), updated as milestones progress.


Current Priority

P0 — Ship is complete. M1 (front door), M2 (CI, release, safety infra), M3 (backlog triage), and M4 (sandbox resolution / sandbox-free onboarding) have all shipped. Marianne now has automated CI (ruff + mypy --strict + pytest with an 80% coverage gate, ~10,300 tests, 85% coverage), a reproducible uv.lock, dependency scanning, a v0.1.0-alpha release, a fully tier-labeled + milestone-assigned backlog, and a sandbox-free quickstart.

Next: P1 — Launch. Focus shifts to M5 (Baton Stabilization), M6 (Onboarding & Pre-Launch), and M7 (Market Positioning).


Timeline

gantt
    title Marianne Roadmap
    dateFormat YYYY-MM-DD
    axisFormat %b %d

    section P0 — Ship
    M1 Front Door Fix           :done, m1, 2026-04-21, 2026-04-28
    M2 CI & Release             :done, m2, 2026-04-21, 2026-05-29
    M3 Backlog Triage           :done, m3, 2026-04-21, 2026-05-29
    M4 Sandbox Resolution       :done, m4, 2026-04-21, 2026-05-29

    section P1 — Launch
    M5 Baton Stabilization      :m5, after m2, 56d
    M6 Onboarding & Pre-Launch  :m6, after m1 m2 m4, 42d
    M7 Market Positioning       :m7, after m6, 28d

    section P2 — Sustain
    M8 Sustainability           :m8, after m3, 84d
    M9 Quality Remediation      :m9, after m2 m5, 84d

Milestones

M1: Front Door Fix

Priority: P0 | Status: Done (2026-04-28) | Depends on: nothing

A new external user can clone the repo, find accurate README content, and navigate to documentation and examples without hitting broken links or stale metadata.

Issue Title Size Status
#270 Fix submodule protocol -- change rosetta-corpus to HTTPS S Closed
#271 Update all README example links to match directory structure S Closed
#272 Update README metrics S Closed
#273 Update pyproject.toml description and keywords S Closed

Follow-on work shipped under M1: removed dead "native backends" architecture references, reframed instrument system as a plugin/any-CLI system, dropped hardcoded claude-code from the hello quickstart so the conductor's default applies.


M2: CI, Release, and Safety Infrastructure

Priority: P0 | Status: Done (2026-05-29) | Depends on: nothing (parallel with M1, M3)

Push to main triggers automated quality gates; a tagged release with changelog exists on GitHub.

Issue Title Size
#274 Create GitHub Actions CI workflow M
#275 Add coverage enforcement to CI S
#276 Add automated dependency scanning S
#277 Tag v0.1.0-alpha and create GitHub Release S
#278 Add lock file for reproducible builds S
#279 Create Known Issues launch artifact S

M3: Backlog Triage and Tracking Recovery

Priority: P0 | Status: Done (2026-05-29) | Depends on: nothing (parallel with M1, M2)

Every open issue has a priority label and milestone assignment; stale issues resolved; tracking reflects reality.

Issue Title Size
#280 Tier-label all open issues M
#281 Create GitHub milestones and assign all issues S
#282 Batch-close stale-runner cleanup issues M
#283 Triage 22 roadmap features -- decompose or defer M
#284 Update progress.yaml and decisions.log M

M4: Sandbox Resolution

Priority: P0 | Status: Done (2026-05-29) | Depends on: nothing

Critical path gate. Either the sandbox P0 is resolved architecturally OR a validated sandbox-free quickstart path exists. Resolved via the contingency: the code_mode bwrap sandbox bug (#210) remains open (it is opt-in and unused by the onboarding path), and a validated sandbox-free quickstart now exists.

Issue Title Size Status
#285 Contingency: sandbox-free quickstart path M Closed

M5: Baton Stabilization

Priority: P1 | Status: Open | Depends on: M2 (CI)

All tier-1 compiler bugs have regression tests; baton correctness bugs resolved; critical integrations wired; schema migration documented.

Issue Title Size
#286 Fix 6 baton correctness bugs XL
#287 Remove 6 stale xfail markers S
#288 Document state reset / schema migration strategy M

Plus ~52 auto-review findings assigned to this milestone covering baton, daemon, IPC, state, and execution subsystems.


M6: Onboarding and Pre-Launch

Priority: P1 | Status: Open | Depends on: M1, M2, M4

A new user can clone the repository, pip install -e ".[daemon]", run a score end-to-end with a free local model, and get a validated result within 10 minutes. The checkout is the onboarding path: the wheel packages src/marianne only, so examples/ (and the hello assembler) come with the clone, and a user who installed without one starts from mzt init instead (GH #388).

Issue Title Size
#289 Create minimal CONTRIBUTING.md S
#290 Cross-link documentation site, mzt.dev, and GitHub README S
#291 Recruit 3-5 beta users and document onboarding friction M
#292 Conduct minimal dashboard security review M

M7: Market Positioning and Launch

Priority: P1 | Status: Open | Depends on: M1, M2, M4, M6

SHIPPED: user can pip install, run a score with free model, get validated result, find docs. Launch announcement published.

Issue Title Size
#293 Write 'Why Marianne' positioning page M
#294 Convert mzt.dev root to landing page M
#295 Add licensing FAQ and evaluate AGPL fit M
#296 Prepare and publish launch announcement M
#297 Articulate 'instrument layer above' positioning in README S

M8: Sustainability and Capacity

Priority: P2 | Status: Open | Depends on: M3

At least 3 iterations tracked; continuity documentation exists; movement-eligible tasks identified.

Issue Title Size
#298 Adopt burst-compatible iteration tracking S
#299 Document succession/continuity baseline M
#300 Identify movement-eligible tasks per milestone S
#301 Create Dockerfile for reproducible dev environment M
#302 Validate willingness-to-pay with 5 potential users S

M9: Quality Remediation

Priority: P2 | Status: Open | Depends on: M2, M5

All 6 tracks of the approved quality remediation plan complete with before/after metrics.

Issue Title Size
#303 Execute quality remediation Track 1 -- full security hardening L
#304 Execute quality remediation Track 3 -- dead code removal M
#305 Address conductor recovery reliability XL
#306 Execute remaining quality remediation tracks XL
#307 Plan API documentation for library consumers M

Plus ~17 auto-review findings covering code quality, coupling, naming, and conventions.


Label System

All issues use this taxonomy:

Dimension Labels Purpose
Priority P0 P1 P2 P3 When must this be done?
Size size-S size-M size-L size-XL How much work?
Type bug enhancement documentation What kind of change?
Source auto-review Filed by automated quality review

Descope Recommendations

These capabilities were explicitly deferred. They represent real value but should not be started until M1-M7 milestones exit:

  • New backend integrations (Ollama, Qwen, etc.) -- market first, then expand platform
  • Dashboard studio -- the CLI workflow works; dashboard is a luxury until users exist
  • Distributed execution -- single-machine is the only tested deployment model
  • Email management concert -- not core to the orchestration product
  • Self-healing improvements -- the current healing pipeline works; improvements can wait for user feedback

This roadmap is generated and maintained by Marianne's PM replacement score. The score itself demonstrates what Marianne does: it orchestrates multiple AI agents through a declarative YAML pipeline to produce this analysis.